5 Facilities · 580 MW · 99% Uptime

Industrial Mining Hosting
From 0.04 USD/kWh

Plug in your miners, we handle the rest. Industrial-grade facilities across 5 countries, 24/7 monitoring, transparent monthly billing, and zero hidden fees.

Live Mining Dashboard

Real-time network data and MarsHub operations

Why Choose MarsHub Hosting

Six reasons we are the trusted choice for industrial-scale mining operations worldwide.

0.04
USD/kWh

0.04-0.06 USD/kWh

Industry-leading electricity rates. Negotiated directly with power utilities in 5 countries.

5
Countries

5+ Global Facilities

US, UAE, Russia, Paraguay, Ethiopia. Industrial-grade sites with 24/7 security and uptime monitoring.

99
%

24/7 Monitoring

Real-time hashrate, temperature, and power metrics. SMS/email alerts on any anomaly.

3
days

Free Setup

Plug-and-play deployment in 1-3 days. We handle customs, transport, rack mounting, and pool config.

100
%

Custody Insurance

Your miners are insured against fire, theft, and natural disaster. Quarterly third-party audits.

0
$ hidden

Transparent Billing

Monthly invoice with detailed kWh, pool revenue, and fees. No hidden charges, no minimum commitment.

Global Facilities

Choose the location that best fits your operational, regulatory, and cost needs.

Location Electricity Capacity Available Suitable For Regulation
US Texas, USA $0.045/kWh 200 MW 65 MW S21/M60S Crypto-friendly
AE Dubai, UAE $0.060/kWh 100 MW 40 MW All Crypto-friendly
RU Moscow, Russia $0.040/kWh 150 MW 80 MW All Permissive
PY Ciudad del Este, Paraguay $0.045/kWh 80 MW 25 MW S19/S21 Crypto-friendly
ET Addis Ababa, Ethiopia $0.035/kWh 50 MW 30 MW S19 Permissive
Need a custom configuration? Contact us for dedicated facility options.

Customer Case Studies

Real partnerships, anonymized data

USA 12 months
Scale 500 miners
Miner Antminer S21 XP 270T
Total Net Profit $1.42M
"MarsHub Texas facility ran flawlessly through a brutal summer. Pool uptime 99.7% across 12 months."

— Anonymous US Mining Fund

Russia 18 months
Scale 200 miners
Miner WhatsMiner M60S 186T
Total Net Profit $580K
"0.04 USD/kWh electricity is the lowest I found in Europe/Asia. Moscow facility is professionally managed."

— Independent Miner, EU

UAE 6 months
Scale 1,000 miners
Miner Bitmain KS5 Pro
Total Net Profit $320K
"Dubai location is a tax-free haven for crypto operations. MarsHub handled the entire setup seamlessly."

— Family Office, MENA

Hosting FAQ

01 What does the hosting fee include?
Power (24/7), cooling, network connectivity, mining pool configuration, real-time monitoring dashboard, monthly maintenance, and basic RMA handling. The fee is all-inclusive — no extra charges for cooling or network.
02 Is there a deposit or minimum commitment?
Yes. We require a 1-month deposit + first-month hosting fee upfront. Minimum commitment is 3 months. After that, you can withdraw your miners with 30 days notice.
03 Can I migrate my miners to another farm mid-term?
Yes, you can move between our facilities (e.g., from Russia to US) at any time. We cover internal logistics. Cross-continent transfer takes 7-14 days and may incur customs fees depending on jurisdictions.
04 Who handles hardware failures?
MarsHub provides first-line diagnostics. For warranty claims, we coordinate with the manufacturer (Bitmain/MicroBT/Canaan) on your behalf. RMA turnaround is typically 14-30 days. Backup units are available for premium customers.
05 How often do I get paid mining rewards?
Default pool is F2Pool with daily auto-payout to your BTC wallet. You can also choose ViaBTC, AntPool, or your own pool. We charge 1% pool fee (rebated from your pool revenue) and 0% MarsHub fee on the pool side.
06 Which mining pools are supported?
All major SHA-256 pools: F2Pool, ViaBTC, AntPool, Binance Pool, BTC.com, SlushPool, etc. We can configure any pool you specify. Stratum URL and worker credentials are set up within 24 hours of miner arrival.
07 How quickly can my miners be deployed?
Standard deployment: 1-3 business days after miner arrival at our facility. Rush deployment (24 hours) is available for premium customers. Time includes rack mounting, network config, pool connection, and first hashrate verification.
08 Can I visit the facility in person?
Yes, with 7 days advance notice. We welcome customer visits to all 5 facilities. You can inspect your specific rack, meet the operations team, and audit the security setup. We also provide quarterly video walkthroughs for remote customers.

Ready to Deploy Your Miners?

Get a custom hosting quote within 24 hours. Free setup for the first 3 months on contracts of 100+ miners.

Get Hosting Quote